![Time stopper 4.02 rus](https://kumkoniak.com/33.jpg)
It was followed by Nebraska (5.38), South Dakota (5.69), Vermont (6.19) and New Hampshire (6.95). North Dakota had the lowest Stress score in December: 4.65. Among those five, only Nevada's Stress score rose from November to December.Īnd once again, the healthiest states were in the Plains and New England. Nevada was again by far the most troubled state with a Stress score of 22.56. And in January, the manufacturing sector added 49,000 jobs the most in any month since August 1998.įor 2010, the sharpest increases in economic stress occurred in counties with heavy concentrations of real estate workers. They added 136,000 workers last year, the first net increase since 1997. manufacturers are finally adding jobs after years of shrinking their payrolls. Those states have large manufacturing bases, and the AP analysis showed that stress dropped most in counties with large proportions of workers in manufacturing. Stress fell most sharply in the Great Lakes states and the Southern states of Alabama, Mississippi and Tennessee. Moldova: Contract RSP/W14/02-03: Rehabilitation of R14 and R8.1Ĭontract RSP/W14/02-03: Rehabilitation of R14 and R8.For all of 2010, economic stress eased in every state but five: Colorado, Florida, Georgia, Nevada and Utah. New 2xDN400 heating pipelines for Micro district 3,6 (Retender) Mongolia: New 2xDN400 heating pipelines for Micro district 3,6 (Retender) Purchase (REFUSE COLLECTION VEHICLE (Compactor-smooth sides type) volume (8m3) Jordan: Purchase (REFUSE COLLECTION VEHICLE (Compactor-smooth sides type) volume (8m3) Procurement of trolleybuses with the autonomous propulsion Moldova: Procurement of trolleybuses with the autonomous propulsion Implementation of Energy Management System
![time stopper 4.02 rus time stopper 4.02 rus](https://2.bp.blogspot.com/-BU5YbIpoKmQ/UR39g9z0hyI/AAAAAAAAACs/I3ewpFO1bbQ/s1600/time_stopper2.jpeg)
Reconstruction of water supply network - Phase VĮgypt: Implementation of Energy Management System Procurement of a special machinery and equipmentīosnia And Herzegovina: Reconstruction of water supply network - Phase V
![time stopper 4.02 rus time stopper 4.02 rus](https://i.pinimg.com/474x/7f/ce/fe/7fcefe45914bd5662fd0cd08e2e45dab--software-website.jpg)
![time stopper 4.02 rus time stopper 4.02 rus](https://i.ytimg.com/vi/2k0SmqbBIpQ/maxresdefault.jpg)
Kazakhstan: Procurement of a special machinery and equipment PIU Assistance Bukojchani - Kicevo Project
![time stopper 4.02 rus time stopper 4.02 rus](https://lh6.googleusercontent.com/-ZWHyzj4DdAA/VS0vevcOwtI/AAAAAAAAPS4/-RBR77J1wjc/s800/54654589.jpg)
North Macedonia: PIU Assistance Bukojchani - Kicevo Project
![Time stopper 4.02 rus](https://kumkoniak.com/33.jpg)